Government Ramps Up Infra, Enterprise Support For Surigao Norte IPs

Ang mga proyekto ng DA-13 sa Surigao Norte ay alinsunod sa layunin na bigyang suporta ang Mamanwa tribe sa kanilang pag-unlad.

NEDA Board Oks Enhanced E-Voucher Food Stamp Program

Pinagtibay ng NEDA Board ang Enhanced E-Voucher Food Stamp Program, isang hakbang para sa mas magandang seguridad sa pagkain at kalusugan ng mga Pilipino.

Philippines, United Kingdom Near GBP5 Billion Infra Deal Under G2G Partnership

Ang pagtutulungan ng Pilipinas at UK ay nagbubukas ng bagong mga pagkakataon sa pamamagitan ng isang G2G partnership sa imprastruktura.

Aparri Marine Research Hub To Boost Blue Economy, Coastal Livelihood

Ang marine research hub sa Aparri ay nagbibigay-daang sa mga pagsisikap na palakasin ang kabuhayan ng coastal communities at ang kanilang resilience.

NHA Allocates P20-M For Zambo Footbridge Project

NHA Allocates P20-M For Zambo Footbridge Project

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The National Housing Authority (NHA) has allocated PHP20 million to build a concrete footbridge for those living in houses on stilts in one of the siege-affected barangays.

The recipient of the concrete footbridge project is Barangay Rio Hondo, one of the five most-affected barangays in the 2013 Zamboanga siege.

Rodrigo Pagotaisidro, City Housing and Land Management Division chief, said Saturday they are just waiting for the NHA to download the funds to the City Engineer’s Office, which is in charge of the implementation of the project.

The concrete footbridge will replace the existing wooden footbridge leading to the houses on stilts in Barangay Rio Hondo.

Pagotaisidro said the construction of a concrete footbridge is imperative to avert a repeat of an accident wherein government and NHA officials fell into the murky water as the wooden bridge collapsed.

The officials, Mayor Maria Isabelle Climaco-Salazar, then 1st district Congressman Celso Lobregat, Negros Occidental Congressman Alfredo Benitez, NHA and other officials were conducting an inspection on April 26, 2018, when the wooden footbridge collapsed.

Pagotaisidro said the City Engineer’s Office will start the work once the NHA will release the PHP20 million allocation.

Meanwhile, he said the wooden footbridge will be rehabilitated by the City Engineer’s Office while awaiting the release of the funds. (PNA)