Dairy Coop Opens PHP3.6 Million Government-Supported Building In Misamis Oriental

Sa tulong ng DOST at National Dairy Authority, isang bagong gusali ang inilunsad ng Dairy Coop sa El Salvador City.

DSWD Allocates PHP8 Million For Community Projects In Misamis Occidental Town

Tinututukan ng DSWD ang pag-unlad ng Tudela gamit ang PHP8 milyong pondo para sa mga proyekto ng komunidad.

Secretary Recto Confident Philippine Economic Growth To Reach 6% In 2025

Secretary Recto ipinahayag ang tiwala sa pag-unlad ng ekonomiya ng bansa na aabot sa 6% sa 2025. Mahalaga ang patuloy na pag-unlad.

More Cordillera Villages See Gains From Tourism

Maraming nayon sa Cordillera ang kumikita sa turismo. Ang La Diyang Haven ay nakikipagtulungan sa mga kapwa atraksyon sa Tuba.

Berong Nickel Exceeds Mine Rehab Targets For 1H 2023

Berong Nickel Corporation surpasses targets, transforming a depleted mine into an eco-friendly haven for tourism and sustainable development.


By PAGEONE Business Today

Berong Nickel Exceeds Mine Rehab Targets For 1H 2023

36
36

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Berong Nickel Corporation (BNC) on Thursday reported that it has so far rehabilitated 30 hectares of the Berong mine in Quezon, Palawan in the first half of the year.

In a disclosure to the stock exchange, parent company DMCI Holdings Inc. said the rehabilitated area is equivalent to 88 percent of the company’s 34 hectares target for 2023.

“We are fully committed to addressing our impacts on the environment and to our host communities. In our first year, we were able to exceed many of our rehabilitation targets,” BNC president Tulsi Das Reyes said.

“The progress we have made in such a short time is a testament to our team’s hard work and dedication,” he added.

BNC said it has installed 672 coconets for erosion control and soil stabilization, and laid down 1,721 meters of geo-textiles to enhance the ecological stability of the areas under rehabilitation.

To fast-track the final mine rehabilitation of Berong, BNC produced 214,052 seedlings, 152 percent higher than its target of 85,000, and has planted 81,709 or 96 percent of its annual target of 85,000 seedlings.

The Berong mine opened in October 2006 and was fully depleted by December 2021.

To be conducted over a six-year period starting June 2022, the Berong final rehabilitation program covers 109 hectares of surface mine, 209 hectares of silt control structures and 25 hectares of stockpile area.

BNC said after rehabilitation, the disturbed areas could be used for eco-tourism, agro-forestry and inland fish farming by the Department of Environment and Natural Resources, local government units and host communities. (PNA)