Northern Mindanao Agencies Launch Women’s Month, Emphasize Inclusivity

Sa pagsisimula ng National Women’s Month sa Northern Mindanao, binigyang-pansin ang mga hakbangin para itaguyod ang karapatan ng kababaihan at ang kahalagahan ng gender equality sa mga komunidad at ahensya.

Zamboanga City Distributes PHP5 Million Power Tillers To Farmers’ Groups

Nagpatuloy ang suporta ng pamahalaang lungsod sa sektor ng agrikultura nang ipamahagi ang 48 yunit ng power tillers sa mga asosasyon ng magsasaka na magpapadali sa kanilang mga gawain sa bukirin.

Davao City On Blue Alert For 88th ‘Araw Ng Dabaw’ Events

Naglatag ng mga security measures ang CDRRMO at inilagay ang Davao City sa "blue alert" upang maprotektahan ang mga residente at bisita sa mga aktibidad ng Araw ng Dabaw, na magsisimula mula Marso 1 hanggang 16.

Negrenses Celebrate Panaad Sa Negros, 7 Other Major Festivals In March

Muling magsasama-sama ang mga Negrense ngayong Marso upang ipagdiwang ang kanilang mga tradisyon at kultura, sa pamamagitan ng Panaad sa Negros Festival at pitong iba pang malaking pagdiriwang sa iba’t ibang bayan sa Negros Occidental.

SMC, DPWH Open Skyway Stage 3 Quirino Southbound Exit

SM Corp. has opened the southbound Quirino exit of the Skyway Stage 3 elevated expressway to Class-1 vehicles, allowing motorists coming from Balintawak and Quezon Ave. to directly reach Manila within less than 20 minutes without traffic.
By The Mindanao Life

SMC, DPWH Open Skyway Stage 3 Quirino Southbound Exit

66
66

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

San Miguel Corporation (SMC), through SMC Infrastructure, opened the southbound Quirino exit of the Skyway Stage 3 elevated expressway to Class-1 vehicles, allowing motorists coming from Balintawak and Quezon Ave. to directly reach Manila within less than 20 minutes from 1.5 hours without traffic.

The opening was led by SMC president Ramon S. Ang and Department of Public Works and Highways (DPWH) secretary Mark Villar.

“The full completion of Skyway Stage 3 will divert at least 75,000 vehicles away from EDSA or C5. This is a realization of President Duterte’s promise to decongest EDSA. Skyway Stage 3 is proof that the private sector and the government can work together towards a unified solution,” Villar said.

Ang, for his part, said: “The opening of the Quirino southbound exit will greatly improve accessibility from Quezon City and Manila. With more private vehicles diverted to Skyway Stage 3 on their way back from NLEX, or coming from Quezon Ave., to Manila, traffic on our major public roads as well as on streets usually utilized as ‘short cuts’ or ‘alternate routes’, will be a thing of the past. This will redound to relief from congestion and faster and easier commutes for many of our countrymen on our major thoroughfares. We thank President Duterte and the government team led by Secretary Villar for all their support.”

And said SMC will continue to deliver on its commitment to bring motorists quality infrastructure that addresses congestion and lack of accessibility.

“We remain dedicated to providing convenient and seamless travel for motorists to help decongest Metro Manila and enable growth in all areas that we reach,” he added.

SMC, which fully-funded and built 100% of the Skyway Stage 3, said the expressway now has 15 operational ramps. These include:

 

Northbound Entry/On-Ramps:

• Buendia (Zobel)

• Quezon Avenue

 

Southbound Entry/On-Ramps:

• Balintawak

• Quezon Avenue

• Plaza Dilao

 

Northbound Exit/Off-Ramps:

• Quirino Avenue

• Nagtahan

• Quezon Avenue

• A. Bonifacio

• Balintawak

 

Southbound Exit/Off-Ramps:

• Quezon Avenue

• E. Rodriguez

• Nagtahan

• Quirino

• Buendia (Zobel)

The Skyway Stage 3, formally opened on January 2021, connects Buendia to Balintawak, and vice versa. Together with Skyway 1 and 2, the Skyway system is a 38-kilometer elevated expressway with 36 on- and off-ramp access points that greatly improves accessibility, transportation, and traffic conditions throughout Metro Manila.