The Survey Mirage: What The 2025 Elections Taught Us About Political Forecasting

The unexpected outcomes of the 2025 midterm elections challenge us to rethink our approach to political forecasting. In an era where digital influence reigns, reliance on outdated survey methods leaves us blindsided by the true electorate.

Peaceful Voting Reported Across Caraga, Davao Regions

Ayon sa mga ulat, nakamit ang maayos na pagboto sa Davao at Caraga sa kabila ng ilang hamon sa logistics.

Foreign Direct Investment Net Inflows Hit USD529 Million In February

Umabot sa USD529 milyon ang net inflows mula sa foreign direct investments noong Pebrero ayon sa BSP. Isang magandang balita para sa ekonomiya.

PRA Woos Foreigners From Europe, North America To Retire In Philippines

Ang Pilipinas ay naglalayon na maging paboritong destinasyon ng mga banyagang retiree mula sa Europa at Hilagang Amerika sa pamamagitan ng pagpapalawak ng SRRV.

DPWH Finishes UP Athletes Training Center

The Department of Public Works and Highways has already finished the new varsity training center at the University of the Philippines in Diliman, which would house more team practices for athletes in the future.

DPWH Finishes UP Athletes Training Center

12
12

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The multi-million-peso new Varsity Training Center inside the University of the Philippines (UP) Diliman Campus in Quezon City has been completed by the Department of Public Works and Highways (DPWH).

DPWH National Capital Region (NCR) Director Loreta Malaluan on Friday reported that the project worth PHP130 million was recently turned over to the management of the university.

The new UP Varsity Training Center has a total floor area of 1,879.42 square meters.

“This is a state-of-the-art, research-intensive facility offering a wide range of resources to help UP student athletes reach their full potential,” she said in a statement.

The sports center has a basketball court, and a gym with equipment.

Likewise, it has dedicated spaces for team practices and meetings.

The DPWH added that the facility was constructed in three phases since 2019.

The project was implemented by the DPWH Quezon City 2nd District Engineering Office. (PNA)